The Project
The complex of 2,346 square metres, located in the municipality of Castelfranco Emilia, consists in two macro-areas, one set aside for the swimming facilities, the other for use by commercial businesses and the gym, acting as the connecting element between the courtyard and the park behind the complex where the open-air swimming pool is located.
There are six functional areas within the swimming facilities, including the entrance hall, seating for spectators, the area containing the pools, the changing rooms for users, an area used as offices and personal changing rooms and the spaces containing the technical plant and storage areas.
The covered pool complex is made up of three pools, one 25m in length for courses with a shallow and deep end of 1.20 and 1.70m respectively, a multi-functional pool of the same depth throughout of 1.30 m and finally a children’s pool divided in two, one 0.60m deep and the other 0.90m deep with a hydro-massage facility. The open-air swimming pool, which is surrounded by a park of approximately 10,000 square metres and includes a multi-lane slide with changing rooms underneath, is divided into 4 areas. There is one 25m pool for courses, a beach-like relaxation zone and an area with benches, hydro-massage and a multi-functional pool.
